d.p.n.s Posted June 5, 2012 Share Posted June 5, 2012 bugger mate. im sure you can rebuildit all sweet as Quote Link to comment Share on other sites More sharing options...
Toucan Posted June 6, 2012 Share Posted June 6, 2012 Guttered man! The guards on this thing were awesome, what were they off? Isuzu MU or something? Remake it better!!! Quote Link to comment Share on other sites More sharing options...
EURON8 Posted June 6, 2012 Share Posted June 6, 2012 Front has been chopped off all ready and some new steel is taking shape. Quote Link to comment Share on other sites More sharing options...
1vaknd Posted June 11, 2012 Author Share Posted June 11, 2012 front end has been fully replaced it handled a whole day at taupo track 3 with high speed drifts and mucking around at hori dori, all with only 2/3 of the tube frame welded. most welds i was unhappy with (wind rain, mig and no sleep) also the whole tube frame front was assembled whilst engine was in so not all pipe had 360 degree welds. next holiday i will pull motor outs and reweld alot of it and make a few tweaks to the design Quote Link to comment Share on other sites More sharing options...
EURON8 Posted June 11, 2012 Share Posted June 11, 2012 stop for a picture? Quote Link to comment Share on other sites More sharing options...
1vaknd Posted June 11, 2012 Author Share Posted June 11, 2012 will sort pics out soon when i get home(aus) havent got my own pc to colate pics and host Quote Link to comment Share on other sites More sharing options...
My name is Russell Posted June 11, 2012 Share Posted June 11, 2012 That's an impressive turn around! Quote Link to comment Share on other sites More sharing options...
mjrstar Posted June 11, 2012 Share Posted June 11, 2012 It was good to see this back in action, even with a few teething issues, top marks dude.. Quote Link to comment Share on other sites More sharing options...
Truenotch Posted June 11, 2012 Share Posted June 11, 2012 LF guard came out looking OK considering. Quote Link to comment Share on other sites More sharing options...
Vintage Grumble Posted January 10, 2013 Share Posted January 10, 2013 Thats looking pretty damn badass, mean jhob on the rebuild. Quote Link to comment Share on other sites More sharing options...
1vaknd Posted January 10, 2013 Author Share Posted January 10, 2013 Cheers VG. So many hours in it. Im glad i can put it in a shed and forget about it for a while. Sleep the last few days has been wonderful! Quote Link to comment Share on other sites More sharing options...
Poo Posted January 11, 2013 Share Posted January 11, 2013 Oh my, Wes........Thats looking 3242% betterer than before. Well done. Skids. Quote Link to comment Share on other sites More sharing options...
kpr Posted January 11, 2013 Share Posted January 11, 2013 nice progress. you going p/s rack or? if you're still using the kp rack and want more lock. just chuck some ke7* /ae8* internals in it. will give you heaps more travel. and should be a bit faster too. Quote Link to comment Share on other sites More sharing options...
1vaknd Posted January 11, 2013 Author Share Posted January 11, 2013 Ive got the same rack that todd runs in the keto, the plan would be to go power steer with a remote electric pump. Lock im basically at my limit until i make some form of new castor arm/lca combo. Will work all this out at a later date once i recover from this toybaru over dose! Quote Link to comment Share on other sites More sharing options...
Guest Chuffaneilious Posted March 28, 2013 Share Posted March 28, 2013 I love this project!!!! Something ive never seen this king of transplant before. A+++ for the out-of-this-world thoughts. LOL. I saw the suspension/crossmember/pedalbox o.0 I fell in love with you, In a non-homosexuall way ov course. haha Then I saw the custom ALL shuff youve done to it and thought YOUTHEHELLISTHISGUY??? (which is shit loads cos theres not much left that is standard, haha) Keep updating. PLEASE, carnt wait to see more. ~chuff~ Quote Link to comment Share on other sites More sharing options...
1vaknd Posted April 24, 2013 Author Share Posted April 24, 2013 unfortunately the job i have taken on doesnt leave me wih a heckof alot of funds to keep the project going. sitting in storage till the day i get a payrise i guess. have literally quit smoking to tryand atain more funds to keep the project alive. thanks chuff! 2 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.