Jump to content

Recommended Posts

  • 4 weeks later...
  • Replies 85
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

  • 3 weeks later...
Posted

Progress is being made

 

Turbo is all assembled and ready to go - have got all the turbo flanges and v-bands required just waiting on the head flange and can start work on an exhaust manifold

spacer.png

spacer.pngspacer.png

JDMYARD 4 Bar Map senor has been purchased along with a PWR Racer series intercooler

spacer.pngspacer.png

Once above head flange arrives can look to send the car to the fabricator

 

 

  • Like 2
  • 2 weeks later...
  • 2 months later...
Posted

112770847_Clutch1.thumb.jpg.d32db4f50bbb23f34d6b4e907f59cbe0.jpgFlyWheel.thumb.jpg.c3ee009535b66f743afd541d70f9f787.jpg1181686573_ThrottleBody.thumb.jpg.d6cd2bf469b959ca416578948aeff67f.jpg

 

Clutch  & Flywheel acquired - will get the gearbox rebuilt and these fitted late Jan / early Feb

Also purchased a 66mil throttle body should make thing easier with future pipe work

Cars getting repainted over Christmas / New Years back to Milano Red from Milano Pink  

  • Like 4
  • 1 month later...
Posted

135496425_10160617111083135_861094937077

Well I had a offer to re-spray the car I took it up - Looks so good in fresh Milano Red
 

He also re-did the Carbon Fiber Spoon Wing

 

135908023_10160617111013135_395345929714

I just brought a House so now I'm broke so gearbox rebuild and fab work for turbo won't occur until Mid to end of the year now 

 

  • Like 5
  • 2 months later...
  • 2 months later...
Posted

Gearbox has been rebuilt

Brand New 2nd, and 5th/ / Reverse

New Synchros
New Bearings

New Clutch and FlyWheel fitted

Need to do a 1000 km then change gearbox oil

Finally then its time to go to fabractors for - exhaust manifold, down pipe, exhaust, intercooler piping and all plumbing

  • Like 3
  • 2 months later...
Posted

Ordered Lines and Fittings to re-do the fuel system good by $1200

Click image for larger version  Name: Lines & Fittings.jpg Views: 0 Size: 214.1 KB ID: 7288402

Then got the final parts needed before car can go to Fabricator for Exhaust Manifold, Downpipe, Intercooler Piping and Exhaust (TurboSmart Stealth 40mill Wastegate & TurboSmart PlumbBack Blow off Valve)

Click image for larger version  Name: IMG_20210830_122845.jpg Views: 0 Size: 3.32 MB ID: 7288400

 

Mechanic coming latter this week to start doing lines and fitting the Alcon stoppers then its off to the Fabricator 

  • Like 2
  • 3 weeks later...
  • 1 month later...
  • 3 weeks later...
Posted

Pipe work all but done except for a couple of couplers / clamps - nearly all the fabrication work is done - just airbox and catch can left to do and a few more weld ons

Should be home next week them its time to plumb it up

fetch?id=7320914&d=1639554316

fetch?id=7320915&d=1639554316

fetch?id=7320916&d=1639554316

  • Like 6

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...