Jump to content

jezas 1972 mk1 escort


Recommended Posts

hey guys, ive been looking threw most of your build ups and there been sum impresive stuff so i thort id add sum of my own build in here.

this is the escort sitting on the ground with the 2lt cortina sitting in it, just to see what it gonna look like, may look high in the foto but that deffently wont be the case when finished.

nokitlh3.th.jpg

it was then out with the engine and tym to strip it down to bare metal. then off to the panel beaters.

baremetalsmallerjp2.th.jpg

ontrailertp8.th.jpg

when there the panel beater had to repair this rust spot, was the worst part of the car

rustworseve7.th.jpg

Link to comment
Share on other sites

more photos, went to the painters 2day, looking pritty good i must stay. all the seams have been filled except for ones between the frotn gaurds and the body cause they follow the lines of the doors. the hinges have also been molded with bog and filler so they look like the are one piece with the car.

this is the rear seam. above the gaurd

noseemlhdm9.th.jpg

hinges, kinda hard to see will get a better foto next time im there.

enginebaylhek3.th.jpg

the front seams also been filled

Link to comment
Share on other sites

  • 2 weeks later...

finaly painted and finished with the paint, the paint took 3 goes to get it right, 1st time the painter sanded the blue, put clear coat on and we coudl see where he sanded, so we sanded it back and resprayed the blue, put the clear on and the clear fuckin reacted, = more sanding, then blue again and couple of clears and the painting is finished = me supa happy now, wota mish tho.

Link to comment
Share on other sites

  • 2 weeks later...
  • 2 weeks later...
  • 2 weeks later...

Up Date: ok been very busy since last nyt posted here, easter sunday i fired it up, the monday i just put more interior in, seats, doors cards , also put the radiator in and plumbed that it, on the tuesday it was time for the exhust so we put a 2 inch exhust wit a coby and a dumpy, then i got to take it up the road for the 1st time, wednesday it went to p and h for a wheel allignment, then was up till 11 finishing it off, cert last thursday = fail, on booster needing another bracket made and installed, u-bolts been to long, drive shaft loop needing plates on the inside of the floor and hand brake needing adjusting, so was up till midnyt finishing that for re-check on friday, since then i been relaxing an just installing sounds, and few other little things, and the car is now stickered,

pics to come, will post them during the week when there a decent nyt for photos,

Link to comment
Share on other sites

  • 3 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...