  1. exhaust wont be listed on the cert plate, unless theres a structural mod to fit it.

     

    probably wont have been certed for the exhaust, as lance doesnt like doing it, he gets me to do a few of his noise test ones, plus you would have been charged more for it ($200-$250)

     

    Yeah, thought it unlikely. It's not that it's rowdy just it has a hideous drone to it and 'cause it's quite short there's not a lot of room for another muffler.

  2. Does anyone know how long the TAC usually takes to get back to ya re Design Approval?

     

    Update to this.

     

    D.A. arrived in post last weekend (a week ago), I managed to badger Justin at LVVTA into calling me the week before and he called Lance to tell him to continue the process that evening. yay.

    Cert plate has been ordered, final inspection when it arrives presumably. Then legal beagle.

     

    Clint, will the side exhaust be listed on the cert? Was a less than ideal move and would quite like to change it back to a rear exit.

    • Like 1
  3. westy- you rang me a while back about the bmw with the front end changed around?

     

    if thats the case the design approval will be for non oe front end geometry- a front suspension with changed pickup points/geometry etc has to be approved by tac.

     

    so did you take it for a cert inspection and the certifier asked you to get design approval, or did the car pass and the certifier sent the paperwork through and it got picked up then?

     

    Yeah, that's the one. Thing is, it is OE front end geometry from the e46, the two cars share a surprisingly similar setout. No custom or one-off parts. I'd have thought the rear would have been more of a concern, but anyway. Maybe i didn't quite explain things well enough?

     

    As I understand it, Lance either contacted them about it or preempted the Design Approval. He also suggested the Car-o-liner report and has completed the paperwork on my behalf. Spoke to him yesterday and found out that the confirmation will be sent to me, not him, hence the question of time.

     

    By all accounts there's no problem with it, save a couple of minor notes on the rectification form. Just have wait. One thing I'm not much good at.

  4. Yeah, so normally you apply for Design Approval at the start of a project as a separate thing from the final cert process. (The two months starts from the start of the final cert process?)

     

    They've had me do an approval after I have applied for the cert, during the two month period. Make any sense?

×
×