Jump to content

ryanfels

Members
  • Posts

    3870
  • Joined

  • Last visited

  • Days Won

    3

Posts posted by ryanfels

  1. So had another busy weekend.

    Spent saturday night and all of sunday finishing all the little bits and pieces so i could take it to the Slipway flat sunday arvo. Managed to drop it off and get the trailor back by 4pm.

    By 9pm that night i get a txt saying the intercooler piping is done and that ITS RUNNING!!! started 2nd crank. :D:D:D

    So i went over tonight and had a listen. it sounds great! Sooooo nasty. Tempting to run no exhaust hahahaha.

    Ill get photos and a video this weekend.

  2. Cheers guys

    Im hopefully going to get the Slipway boys to wire it up, will have a chat to them tomorrow. Im using the standard 2jzgte ECU

    I got some custom brake pads from Race Brakes and these things have huge discs so i should be sweet, im more worried about traction as im only using 195s for now :?

  3. Alright, heres an update for the sakes of an update

    Heres how she looks at the moment.

    1001851.jpg

    Everything that requires the engine in to be fitted is, so shes coming back out this weekend to get the final welding done on the mounts and so i can remove some loom i dont need

    1001853v.jpg

    Im now at a stage that requires other people to work on it (wiring, exhaust etc) but all going to plan, i should be able to take it for its 1st drive in 3/4 weeks.

    viewtopic.php?f=18&t=15568

  4. sweet, cheers zeb

    ok, so i had a bit of a busy afternoon

    this

    1001805t.jpg

    +

    1001804e.jpg

    =

    1001818.jpg

    So everything fitted sweet which i was surprised about. its not even close to hitting the clutch master or the dunp pipe. theres about a fingers width of room between the rear turbo and the steering box. So i think with some stiffer rubber mounts, it will be mint.

    To say im pretty fucking stoked is a bit of an understatement! :lol:

×
×
  • Create New...