Jump to content

88fc3s

Members
  • Posts

    95
  • Joined

  • Last visited

Posts posted by 88fc3s

  1. Yeah I got that book at home. It states that if you remove the airbag components you need to go to the front towers in "y" formation. I rang Terry from msnz in Wellington he said the rule has not changed and it's fine to fix to the front towers the only rule is requiring it for cars that will be removing airbag and remaining street legal.

    Only reason I rang is I'm helping a friend put a cage in his s15 and he's going through to the front towers

  2. I'm actually not sure it was built a while ago now probably a year. I don't see why they wouldn't allow it. It makes the car handle better and I'm sure it wouldn't make it any less safe. I know if you're running a street car that had or has factory airbag you have to go through to the front towers to retain it for street use as its what had to be done in my mates fd3s

  3. Another big spend up. This time for the turbo, bov and Wastegate.

    First off was the turbo. It's a Garrett 3582r with a 1.06 rear. Some people said it might be a bit small but I'm not chasing massive power I'd rather a reponsive reliable power range

    Then I went for tial for the bov and Wastegate. 50mm bov and I went for a 60mm for the Wastegate. The reason I went for 60 was that tial only make a 44 then they go up to 60. Rotarys flow a lot of exhaust so thought it'd be safer to go bigger

    Enough of me typing here's some pics

    20130117_180254_zpslmypdazy.jpg

    20130122_174009_zpsjzbbmhcf.jpg

    20130122_174040_zps7lqz3gs0.jpg

    • Like 5
  4. So I made a lockable stand for the motor. Since it will be sitting for a wee while before she goes in

    Also my old block came with a lightweight flywheel so I took it to a local business in town to give it a skim and balance it...

    Then brought myself a clutch. Something not overly un drivable because it still needs to be street driven so I went for a single plate setup

    20130115_164654_zpsusngj8ri.jpg

    20130115_205017_zps6briudrc.jpg

    As you can see from the above picture I got my father to machine up a rx7 specific clutch alignment rod

  5. Spent a bit of time under the bonnet removing the last few bits. Welding and bogging up some un used holes like the old heater holes then we hit the hole car with a heavy solids primer.

    20121228_190426_zpshpxoawvg.jpg

    20121229_184657_zpspc9nzujx.jpg

    20121229_184750_zpsjyqv1onf.jpg

    20121229_184722_zpscmaac3cy.jpg

    Oh and before we primed the car I scotched the rollcage then used a wattles etch spray can primer then we coated that with the h.s primer

    • Like 1
  6. So my orginal plan with the engine setup was going to be a factory new fd3s block from mazda. Then run some sweet bolt on for a nice reliable setup. But after pricing one up and talking with Warren from PPRE I ended up getting a new race block from them for a good deal! Things getting pretty serious

    IMG_20120721_162606_zpskfw2q0qs.jpg

    It's a bridge port block. 3 mm seals and doweling

    • Like 4
  7. Got the loom all sorted. This job was massive I had a lot of help from a good mate of mine as wiring is not my strong point. The first picture is what I'm left with now and the second is the wiring that's been removed. Note this is not the engine side just the car loom for electrics etc.

    20121223_200503_zpsvulhvlnt.jpg

    20121223_200458_zps4mokkz7g.jpg

    • Like 3
  8. Done the gearbox mounts first. Was a easy straight forward unbolt/bolt in application.

    20120925_104526_zpsqxtw8rom.jpg

    The engine mounts on the other hand required a press so I took them into work and pressed out the old mounts. Then got the gas torch onto them to clean off the old leftover rubber then bolted the new mounts in

    20120925_143857_zpsspf8eypt.jpg

    20120926_111111_zpshl8nchk5.jpg

    20120926_112323_zpsjenbdhv0.jpg

    • Like 2
  9. Now the rollcage is complete and waiting on homologation I started sorting out some bits from Japan and pulled out my front knuckles to get c's garage to modify them for more lock

    These are the modified knuckles and the before and after photos of the amount of lock

    20121016_163636_zpsdq45qquk.jpg

    20120926_141743_zpsy65vthyc.jpg

    20121017_201325_zpszn0xqhma.jpg

    • Like 1
  10. The next big mission was the rear setup on the rollcage. I decided for a x pattern between the rear laterals and the harness bar below them then one diagonal in the main hoop. On the harness bar I welded some stoppers to prevent the belts from moving along the bar.

    20120916_175732_zpswet68ehu.jpg

    20120919_165649_zpsqo3avsfl.jpg

    20121016_163657_zpsuc8h7k9z.jpg

    Then I decided to go through the front of the car with two bars to the front towers. It was a much bigger job than I thought it would be but I'm glad I done it. Mainly cutting a lot of holes so I could fully weld everything correctly was the biggest problem. Here's a few snaps off the bar setup

    20121010_185440_zps76qe8ttj.jpg

    20121004_202829_zpsai8vyqs7.jpg

    20121010_185506_zpszcwvl6qb.jpg

    • Like 3
  11. After all that was complete we put the cage back up tacked and welded the hoop and plates in place and used a porterpower to push the laterals back into the body of the car. Then welded everything up including the side intrusions and dash bar. Then we made and welded in the rear laterals

    20120915_151457_zpsq3hvwcla.jpg

    20120915_151505_zpsjt1b1e2f.jpg

    20120915_151520_zpsa9cdvvxc.jpg

    Also stitched the cage to the body of the car in several places

    20120915_151636_zps7ysfefsw.jpg

    • Like 4
  12. I took the car to my old man's work because it had better gear for the next step.

    First thing we had to do was weld as much as possible of the underside of the roof setup.

    20120915_082916_zpsmspkdlyj.jpg

    20120915_082801_zpspaj2vlzi.jpg

    After this was done we removed the dash bar. Cut tacks and removed the footing plate for the main hoop. Then we used a strop to pull the front laterals inwards to get them onto the floor and dropped the hoop through the floor (I had holesawed holes prior to tacking hoop in) then welded up the top complete off the roof setup so everything was 360° welded

    20120915_101502_zpsmys6u7jg.jpg

    20120915_101514_zpseangtv1e.jpg

    20120915_101506_zpsq1f5vwad.jpg

    20120915_101526_zpseaxerqsw.jpg

    • Like 1
×
×
  • Create New...