Jump to content

Recommended Posts

  • 2 weeks later...
Posted

Put the spare into the uncut frame to size it up while I was re-arranging the bikes today.

This will be a slow project as I have a few other things on the go as well, finally sorted the RG150 powervalve issues I think.

I used the spare part engine to mock it up and the biggest issue is gearbox. I have a dual ratio TC125 box or a TF125 Ag box.

13.jpg.2f5f0698541785033f5152a114229013.jpg14.jpg.ab0d108e4990b21a0e0a851d0e1dc1cd.jpg15.jpg.f44ff41a07470d6867ff582bb0ec426f.jpg16.jpg.22c53f112ad3b2e7db9f80ffa8d1f017.jpg17.jpg.1e4cc249d352828132afaf3e0098e681.jpg 11.jpg.86ebbe4274571784adbfb9e609967368.jpg12.jpg.84732a70ccbad339a077d0a99c4d7eb5.jpg

  • Like 4

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...