Since I plan to ship these back to NZ I want to make as few sand boxes as possible. So Im making the patterns removable from the boxes. Usually I just glue them down.

Threaded insert 

O3OOjWE.jpg

6Yzh0AM.jpg

AUuqeiL.jpg

The removable sections. Still need a bit of cleanup.

Cj1pm8V.jpg

vSD42Un.jpg

Posted

Putting the sand in the freezer before adding the catalyst has given me a good 15-20minutes work time (instead of 5!)

Did the outer mould today with 30kg of sand no issues.

wUktaDI.jpg

v6DpSMJ.jpg

aVyl8WW.jpg

T8mWQDA.jpg

NKofTjB.jpg

Posted

Busy weekend. 2nd half worked well. Little removable corner inserts look clean. :grin:

Next I need to make a new inner core and figure out where to put some risers. Should be close to going to the foundry!

7DCk4fp.jpg

TkucMbj.jpg

ccF6Mhq.jpg

rYyaIj9.jpg

bHh4x0T.jpg

  • 2 weeks later...
Posted

New core done, ingate and risers added. Sealed and bolted up ready for the foundry. Made a mistake on the size of the ingate unfortunately and since its glued closed Im sh#t out of luck.

So we'll just have to see how it goes. :neutral:

rHvxskJ.jpg

7NFvecS.jpg

3ZfECt1.jpg

wHNQaOU.jpg

Posted

Made a cool paper weight!

As I thought, the in gate was too small and it filled too slowly causing some cold shuts/holes.

Also the thicker sections in the middle shrunk and caused some tears.

Other than that it looks reasonable.:grin:

So the plan is to increase the ingate area (maybe add another gate on the front)

Then to sort the shrinkage I need to learn about adding heat sinks into the sand mould.

uJkSzlO.jpg

6RQbs7c.jpg

DG6tHky.jpg

xrmOq3k.jpg

2wggXU0.jpg

UxPjgBG.jpg

Posted

So the plan is to add 4 risers to the thick top areas.

Then add chill blocks for the bosses in the middle. Couldnt find info on sizing a chill block so Im going to go with making one set total the mass of the boss and the other set twice the mass. See if they are any different.

Also doubled the ingate area (back to what its meant to be in theory) and made it feed from both sides.

gT14xw8.jpg

90qCvEi.jpg

h8jSYYE.jpg

PHNap82.jpg

Posted

Got the next one ready.

Now have 4 chill blocks, 4 risers, 2 main in-gates and 2 small gates.

One of the chill blocks didnt pack very well so we'll see what happens there. The sand around that area is pretty thin so theres a chance itll get super hot and fall apart.

Bigger problem is I had an issue with the sand strength for some reason and it cracked when bolting up. Hopefully it doesnt fall apart when filled!

LoQaljT.jpg

1Jil6dx.jpg

Hk63ixF.jpg

ySKTMrn.jpg

tbo3M6H.jpg

WPLZlVB.jpg

4UgxEXs.jpg

Posted

uwXfIDC.jpg

Well it worked pretty good! :grin:

Only real defects are on the face with machine allowance.

The volume of the chill block didnt really seem to matter so I think going forward I'll size them to at least 100% of the volume that needs chilling.

9iPs8f5.jpg

pJWKgLW.jpg

Q1Moi8q.jpg

k4Kr3bp.jpg

CXqpkAL.jpg

REoQE8f.jpg

7kLr2um.jpg

Kf6eRT6.jpg

Posted

So the only issue was the back face.

It looks like a crack. But what I think happened is the tapered 'disk' type chill blocks have no where to expand to. They are also in really thin sand. So when the chill block started doing its thing and getting hot it expanded, cracking the sand and pushing it into the face that hadnt solidified.

The front did the same looking at the sand mould after the pour but it wasnt on a flat face so it didnt matter.

May look at changing it to more of a boss like the others.

XZU4S6U.jpg

  • Like 1
  • 3 weeks later...
  • 2 weeks later...
  • 2 weeks later...
  • 5 weeks later...
Posted

These are 'feet' for the sump. So the engine can stand upright. Good chance ill break them off at some point so I printed a hole up them and bonded in some steel dowels.

RyrMXDYh.jpg

K0YNYbKh.jpg

Started bogging.

aN2zrmsh.jpg

BuJZINUh.jpg

  • 2 weeks later...
  • 4 weeks later...
Posted

Since I can only safely mix 30kg of sand at once Ive made some partitions over the pattern for 30kg sections.

Will do some sequence of removing walls and work along the pattern.

Probably key the sand together as I go so hopefully it doesnt shift around.

The base is an overly complicated 30mm spacer that the inner cores align to. Could have done it out of wood but when you have a big printer why not!:)

Once Ive figured out if the pattern works I will be able to fill it at the foundry in one go without partitions.

NFurxFch.jpg

55zE9lNh.jpg

79P9Vhhh.jpg

Qcw83GJh.jpg

KRBeukNh.jpg

CoNNId4h.jpg

ny34wlNh.jpg

qmxXIkxh.jpg

hZDFdXOh.jpg

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...