yoeddynz Posted December 11, 2014 Author Share Posted December 11, 2014 Cheers guys for offers of help- fuck I bloody well hope this up by xmas. We will know more by the weekend as to how we are going. So far we have this up- started late because plans and instructions are a bit shit so couldnt make out some critical bits. But got into it and was fun once we had two portals up and secure. Before that it was a bit oooohhhheeerrrr woooowaaayyyy wobble wobble ahhhh errr oo. Scissor lift machine is great but gotta be sensible with it! Man I cant wait till we get this up and clad 8 Quote Link to comment Share on other sites More sharing options...
punkoutnz Posted December 11, 2014 Share Posted December 11, 2014 Do those A frames have any chords on them? The shed we got at work didn't originally have them but when we were assembling it the gussets at the top wouldn't hold so ended up having to make some. Would probably be okay once the whole shed is together but we had two frames come down before we put lower chords in there. Quote Link to comment Share on other sites More sharing options...
Rookie Posted December 11, 2014 Share Posted December 11, 2014 Oh man you are in for a treat, have the shed company on speed dial as none of the plans will make sense. 2 Quote Link to comment Share on other sites More sharing options...
63Ragtop Posted December 12, 2014 Share Posted December 12, 2014 Tiz a bloody good size, reminds me of a Armish barn raising. Quote Link to comment Share on other sites More sharing options...
yoeddynz Posted December 12, 2014 Author Share Posted December 12, 2014 Do those A frames have any chords on them? The shed we got at work didn't originally have them but when we were assembling it the gussets at the top wouldn't hold so ended up having to make some. Would probably be okay once the whole shed is together but we had two frames come down before we put lower chords in there. Yeah there are knee braces and apex braces yet to go in. They would have been fitted from the beginning....... Had they been in the fucking delivery! Got heaps more done today.. luckily main frame is all up now just before wind picked up! Will take some pics. It looks so huge...... So many old cars..... 2 Quote Link to comment Share on other sites More sharing options...
Popular Post yoeddynz Posted December 13, 2014 Author Popular Post Share Posted December 13, 2014 Yesterday Shane (siedways sickness) came out and helped us out. Compared to the last two day previous which had been a bit manic betwen dealing with the shitty shed company suppliers and dealing with bloody huge wobbly portals, Saturday was just so cruisy and relaxed. This is exactly the way we wanted it to be had the shed arrived on time. We could have just been so chilled and take time knowing we had two weeks. We WILL be fighting the shed company for compensation etc but that's another story. So Wedensday was wet but we assembled the portals. Then retreated to the cosyness of the warm dry truck and fluffy warm dry cat. Thursday and friday the portals went up. Wobbly and scary until braced but by friday late afternoon we had won that battle and just in time because by did the sea breeze pick up from down the valley and it would have been just downright dangerous to be lifting them. I was so relieved when we put the final sidewall girts in place and some X bracing. Saturday as said was a day of chill. Music on. Beers flowing. Sadly sun never came out to join in the party but at least it stayed dry. Hirepool have been so totally proffesional and had come out friday afternoon with a better newer scissor lift as the earlier one had annoying faults and kept needing re-setting. The new one is great. We now have the main skeleton all up and its feels really solid. It'll be even more so when clad. It feels so huge but for us having never had our own shed anything would feel huge. Today we will do the end framework and sort out the door jambs etc- sadly the shed company has fucked up again and bits are still missing plus the plans do not represent the kit we have been sent which could get messy when it comes to COC. Luckily we have 10k of their money as leverage! Hopefully will start cladding it on monday so long as the wind stays down. This is where we are at this morning.. From yesterday... 10 Quote Link to comment Share on other sites More sharing options...
CaMpylobacter Posted December 13, 2014 Share Posted December 13, 2014 man, so shithouse that there's STILL bits missing and you have pooey instructions etc progress is progress though! that's awesome 2 Quote Link to comment Share on other sites More sharing options...
Seedy Al Posted December 14, 2014 Share Posted December 14, 2014 that does look rather spiffing indeed! 1 Quote Link to comment Share on other sites More sharing options...
yoeddynz Posted December 14, 2014 Author Share Posted December 14, 2014 Arrrrrrggggggg! The recommended rebate dimensions that the shed company emailed me for the doors are wrong too! Plus found more bits missing. But otherwise yeah its looking good! Quote Link to comment Share on other sites More sharing options...
flyingbrick Posted December 14, 2014 Share Posted December 14, 2014 Jesus that's big Quote Link to comment Share on other sites More sharing options...
be4ver Posted December 14, 2014 Share Posted December 14, 2014 Fuuuuuu... That's a huge shed. Shed of my dreams! I take it you guys will be collecting the rain water of the roof of it eventually? I imagine there will be a butt load of water collected by that roof! Quote Link to comment Share on other sites More sharing options...
yetchh Posted December 14, 2014 Share Posted December 14, 2014 what are dimensions of the behemoth? Quote Link to comment Share on other sites More sharing options...
yoeddynz Posted December 14, 2014 Author Share Posted December 14, 2014 Its only 7.65 wide by 14.5 long but its 4.5 high at the sides so we can do a mezzanine down one side, the side closest to the bush. Will add more windows later on but for now only two going in. Hang on..will find a pic... Quote Link to comment Share on other sites More sharing options...
yoeddynz Posted December 14, 2014 Author Share Posted December 14, 2014 here... So the roller doors will be on the left looking from the truck and to the right inside there will be a full length mezzanine floor (with firemans pole!) Not a dwelling. No sir mr councillor.. Actually it wont be. Just a bathroom, living space, laundry, smoko room, sick bay with bed in case you get really ill working and need to rest...for the night.. did i mention the fireman pole? yeah i cant wait to deck this out! 7 Quote Link to comment Share on other sites More sharing options...
Mof Posted December 14, 2014 Share Posted December 14, 2014 Mate that's awesome Quote Link to comment Share on other sites More sharing options...
77magnum13hundy Posted December 21, 2014 Share Posted December 21, 2014 holy shrit thats a bigass shed, i was thinkin a double garage type deal and then bammo! thats epic, i see you will have at least a two poster in your future. Much jelly. Quote Link to comment Share on other sites More sharing options...
yoeddynz Posted December 22, 2014 Author Share Posted December 22, 2014 Yeah I love it. Been looking at hoists and very keen to get one asap! Been looking at these ones which are copies of the Heshbon ones I know from old work, from what I can see... http://www.trademe.co.nz/business-farming-industry/industrial/hoists-jacks/auction-823764697.htm Missed out, should have bid on it.. on a tidy secondhand Heshbon one in chch that sold for 3k. Nice hoists. Quote Link to comment Share on other sites More sharing options...
Seedy Al Posted December 22, 2014 Share Posted December 22, 2014 totally agree heshbon are a damn good hoist arms are the right length and all that sort of stuff. quick lift etc. dreams Quote Link to comment Share on other sites More sharing options...
kyteler Posted December 22, 2014 Share Posted December 22, 2014 I've contemplated this one a couple of times lately... http://www.trademe.co.nz/business-farming-industry/industrial/hoists-jacks/auction-825034193.htm Quote Link to comment Share on other sites More sharing options...
yoeddynz Posted December 22, 2014 Author Share Posted December 22, 2014 Yeah thats just like we have at work. Great lifts. Never had problems with them. Thats a good price micheal- especially as frieght wouldnt be too spendy. I was quoted yesterday about $300 to get a lift from dorkland down to nelson which is pretty fair for its size. Quote Link to comment Share on other sites More sharing options...