Jump to content

NicT's UZA63 Toyota Carina


NicT

Recommended Posts

  • 5 weeks later...
  • 2 weeks later...

10013432_10152312121270837_7609902511086

 

Diff is complete, mega thanks to Liam. Now i have to build him a 4age in exchange for his fabrication skills.

 

Intercooler will be turning up soon, so we will start poking around the front of the car soon.

  • Like 2
Link to comment
Share on other sites

  • 4 months later...

Page 9, What a disgrace.

 

Doesnt mean we haven't been working on the beast.

10426183_10152579642135837_8259047193997

 

Odd looking lower control arm

 

10474218_10152579642320837_3356430558159

 

Chop chop weld weld

 

10509638_10152579642440837_4456704632807

 

Finished product

 

10425410_10152579642560837_6250292964860

 

14939_10152579642795837_4830485671310306

 

Pretty happy with how they turned out considering its been a LOOOONNNNNG time since i tackled a fabrication project. I offloaded the diff on someone else to do in exchange to wire up their crap. 

Was satisfying to make it, take my time and make it all nice.

 

While I was doing that my old man was setting up his new brakes.

 

11260_10152579642915837_8944843427608257

 

The idea of the project was for us to go 50/50 in everything, but I just cant keep up with his spending...

 

10612968_10152579642995837_8072773114769

 

Hilux in and fitted, S15 rear rotors and calipers, with Surfab twin caliper/hilux adaptors. Idea is to run 4 rear calipers, 2 for hydro handbrake and 2 for normal handbrake and normal rear brakes.

 

10616389_10152579643265837_7157222868288

 

Honda radiator for water-to-air intercooler and 16 row oil cooler

 

10513472_10152579644045837_8773723887904

 

Better look at the front strut.

 

Todays bash around the garage inspired me a bit more to get motivated on the car. But its hard to find time between working 2 jobs and running a company. But ive put aside a day a week now to at least try and nut something out.

 

Engine is also wired up.

 

 

To do:

Dash

Water plumbing

Oil Pumbing
Drive shaft

Wheels

New brake lines

Adjustable Pan hard rod

 

Recently completed

Front suspension assembly

Brakes

Wiring

Diff

Diff head

Fuel

Alternator mount

  • Like 3
Link to comment
Share on other sites

  • 9 months later...
  • 1 month later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...