Jump to content

MRWEST

Members
  • Posts

    1580
  • Joined

  • Last visited

Everything posted by MRWEST

  1. Got a bit carried away on the shed build haha
  2. Been a bit slow last few months as been trying to get new shed finished but finally in there and got hoist up so back into the car. Motor and box need to go in as one piece from underneath with front subframe so bought a trolly lifter thing which made life so easy. Chucked the motor and box back in with the cooling system last weekend to work out a plumbing list to order all the oil, water, fuel braided lines and fittings. Also working out brake line routes and working out what else i need to do to finish off prep to strip it and get it back to the painter. Basically want to have the car dummied up in full then get painted/motor built etc so once painted its just assembly to finish.
  3. Getting full paint or just touching up repairs?
  4. Few more things happening in the background. Marks finished my sump so ill pick that up next week. Azhar has sent me a few more goodies, They got stock of coupe boot lids so i got a new one instead of fixing my old one/s up. Also got some BC Gold damper adjustable rear shocks and the new power front window kits they released, thought why not be kinda handy having electric fronts while im at it! Cars finished at fab now flat boot floor, patches in the engine bay, oil cooler mounted, DBW pedal mounted, couple of other minor jobs done as well as a hidden washer botle setup under the front guard. Will pick it up one day next week when the weather is good and bring it home. Next mission will be to chuck motor/box back in and do all the brake, fuel, oil, water plumbing probably over summer holidays before pulling down for final time for paint.
  5. Epic man you must be so stoked, that was a huge project wrapped up in a pretty short time frame considering! cant beat the feeling driving home legal finally!
  6. yeah was talking to repair certifier last week and he was complaining about the fees for those going up massively too.
  7. they havent, oh yeah i know the car ill flick him a message (most of the off the shelf pac/dma ones are ginormous bloody 100L things for some reason take up all the boot !)
  8. cheers man, stoked how its coming together, sucker for things being mint is an issue sometimes haha.
  9. Well a few steps forward few steps back. Engine is at Revolution getting the sump fabbed up after they measured up engine in car. Should get that back shortly. Car went to where my painter works over in Tauranga and ended up doing a few more things than planned. Oil cooler is mounted, tucked up nice a high which is what i wanted without cutting the lower valance. Someone had patched in front of the struts/tubs on both sides (common rust spot) and the swages didnt line up with what was left of the factory swages and the widths were different so we decided to cut them both out and redo them as want the engine bay to be looking a million bucks. Came up really good bloody happy with it all. Needed to do a small notch to clear that starter so they fabbed up a wee bulge. Then we ended up cutting out the boot floor. Upon further inspection it had like 5 or 6 patches in the boot and the tyre well was either original or replaced with a pretty manky one that was really pitted. OCD of myself and the painter got the better of us and decided we would cut that out and just do a flat floor and remove the tyre well. Got this pic this morning, still to be welded in but fabbed up and sitting in place. Also decided to bite the bullet and replace my factory fuel tank, was looking a bit manky and wanted to modify anyway to have intank pump with a swirl pot to avoid having external pump and surge tank etc. So have got an order in with Dynamic Metalcraft in Aussie to get one of their fabbed alloy powder coated tanks with intank pump and swirl pot around pick up etc and my chosen dimensions so i can still have some boot space. So a bits happening ,hoping to have car back in the next month or so and then i can get back onto it and im going to chuck motor back in check sump clearance, plumb up water, oil, fuel and brakes and do a final test fit of everything to make sure i dont need to drill anymore holes etc.
  10. Looks bloody good mate, top notch work as always!
  11. Cheers man hes done a nice job of it all!
  12. Bit of progress last week, Finally picked up the car from fab, albeit not quite done but bulk of stuff done, Full stainless headers and 3.5" exhaust with promuff resonator and muffler, custom radiator with maradyne fan, PWR Core, twin pass with shroud etc, overflow bottle, catch can, engine and gearbox mounts, battery box in boot and washer bottle in boot. Beattys had built my driveshaft which fit just thankfully (designed a 3.25") so was a bit worried it wouldnt fit but we are in. Managed to fit it all in without cutting the tunnel or firewall which was my goal, had to cut the floor to clear starter but all good otherwise. Car is at Revolution Engine Services to get the sump done currently then off to Tauranga back to the Painter tomorrow and couple minor fab jobs (mount DBW pedal, mount PWR oil cooler, patch floor where starter had to be clearanced and whip up a jig for body to sit on).
  13. Well things are progressing slowly, Went back for a visit this week and radiator is now all made bar mounts, PWR Core, twin pass end tanks made up, AN fittings for lines. Custom sized/made to tuck under rad support to allow maximum room for the motor. Plan is to pick it up next week to get the sump done by Mark Haynes and that will more or less complete the fab work.
  14. damn thats sick, wish i did that on my car haha extra slam is how good!
  15. Slam bags, viar compressors seems to be the go to combo for decent quality, what i run in my car, Had firestone bags and they were shit didnt last more than 3 or 4 years before perishing.
  16. I thought you might have bought that after seeing your wanted posts and Mikey saying he had sold.! I had it listed for Mikey for ages and did a few bits of pieces on it before it went on the market. He painted my Impala and is painting my RX3. Bloody tidy car thatll look a heap different with some different wheels!
  17. Managed to get back into the fab shop this week check on progress, Has been a bit of progress Mounts all done, headers and exhaust tacked up, battery box and washer bottle made up, Shes a tight squeeze but all going to fit just. Still a fair bit to go to finish off this stage but progress is good!
  18. Another year another heap of motoring done, Just knocked off Beach Hop 23 for the week, Plenty of trouble free cruising. Had a young fella last year so was wanting to get him a 64 Impala pedal car done to match my car. Managed to get finished the Wed morn of beach hop thanks to the lads who put in some big work the couple weeks before. We bought in the body from Pedal Car World in the States then Hayden at Jokers Wild Kustoms made a chassis for it for us and we got a 12V kids car and robbed it of the motor and steering. So its all remote control and when hes older will be able to drive himself. Then Mikey who painted my car originally got it all painted up to match my car. Came up bloody amazing! Cant keep the young fella out of it he was loving it.
  19. Hope Bob is still....The RX3 was inspected by him prior to repairs and checked post repairs (before i bought) and had to take back to him once its back together for final sign off......Talked to him August 2020 when i bought the car and he was ok then but that was 2.5 years ago...
  20. 20B too long to run mount off the front like ya normally do with 13b, Seems to be the common way most people have been doing it of late that iv seen, doubles as sump flange and engine mount. Just been taking the lead of the engine builder and fabricator who both suggested doing this way. Guess it spreads the load throughout and mounts are in a more central position than an end as well? Still needs some refinement/trimming up of the wings as well.
  21. Wee while no update. Things have slowly been ticking away in the background. Car has sat at fabricators for a while parts have been collected and he finished existing workload. Plan is for him to do the following: -Custom sump/engine mount & gearbox mount -Custom radiator (Tucked under rad support panel) with PWR core and Oil cooler to suit -Full stainless headers/exhaust -Catch cans/overflow bottles -Battery box for in the boot Hes made a start in the last few weeks and its coming along nicely! Motors mounted in the hole and fits nicely. Going to go to steel bellhousing for my S5 FC box which will give me a little more tunnel clearance and mean i don't have to try jam a scatter blanket or shield in if im wanting to run the drags once its done. Will also be converting to hydraulic release bearing to remove the clutch fork and slave again for tunnel clearance. Can get away without cutting firewall or tunnel doing all of the above which im stoked about as didnt want to cut up. Hopefully next month or so will be done here and on to the next stage.
  22. EZ30R with boost aint that reliable in factory form the rods are tiny, mate had one about 250-260kw atw and bent a rod ended up building a built bottom end, Another mates got a 500kw one might be a bit much for a leone though Even in N/A form though they sound epic and can get not bad kw atw with an exhaust and headers and a ecu especially in a small car like that, and in n/a reliable as!
  23. Who did you find to do glass in the end mate?
  24. If i remember rightly hes got a hearty accecnt and hard to understand but he was cheap as chips and did a good job
×
×
  • Create New...